The Rattle snake lookout ride 5/11/08
Herd 22 different snakes on the trail never saw one.
I think they were afraid of Bowtie
How did Cindy Split the rubber?
We figured that they did this for the trucks that are bring DG
This fence is waiting for a gate to be built. The questions is
who is going to Fund it?
To get and idea of where it is on the trail.
New bridge. Look they left enough room on the west side to cross. needs to be
cleaned up though.
Close up view of the west side of the ramp
Bow stopped to take a look before he would go?
Looking from South to North
That could be cleaned up for another crossing
Were did those ears come from
Came a new way to the Steel Bridge.
Always with a smile
Much better
This is where we came out on the North side of the Bridge
Another Shot
To the left of this is where you can see the trail
View of the bridge from the north side of the creek
Located in the middle of know where?
The crossing you have to make to get back to the south side of
the trail.
Hip waders are needed here and some clean up
Careful here
Doug in Uniform at the Gazebo
Love birds
With a smile
Black lipstick?
Ah rubber bit
New Bridge 28 megs